From the drop-down choose "Replace 'pot' rate value based on weekly threshold" and click Add as shown below
Then enter the following information:
...
Applicable When should be left blank
The timesheet is then entered using the standard timesheet entry as shown below
...
Then enter the following information:
- Day: MondayAll
- Pot Rate Name: Standard
- Threshold: 40 7.5
- Over Rate Name: Overtime
- Under Rate Name: Standard
Applicable When should be left blank
The timesheet is then entered using the standard timesheet entry as shown below
The rule is applied after the timesheet has been submitted. The modified timesheet can be seen below.
It can be seen that the shifts on Monday and Friday have been split into 7 and a half hours on